Requirements for Planning Permits are different compared to Building Permits. A contractor is not required to apply for a Planning Permit. Property owners are not subject to owner-builder requirements and are able to pull planning permits regardless of if they live at the project address or not.
Drawings and plot plans of the proposed work must be included with their respective application. Once the Planning Department approves the application, drawings, and plot plans, work can commence.
Most Planning Permits are valid for six months. The Planning Department must conduct a final inspection and pass the inspection to formally close out a planning permit (inspections are not required for Sign Permits or Temporary Sign/Banner Permits).
PERMITTED CONSTRUCTION HOURS
Monday - Friday: 7 a.m. to 7 p.m.
Saturday: 8 a.m. to 5 p.m.
Sunday and Holiday: CONSTRUCTION PROHIBITED
Report Unpermitted Construction
To report construction being performed outside of the permitted hours or report work being done without permits, contact the Code Enforcement Department at (310) 973-3220.